Special Projects

130mtr high floating fountain for the King of Bahrain.

The fountain is located near the new library and grand mosque in Juffair. Humber Electrical designed, built and installed the 690v switchgear used on and offshore.

Our scope also included programming plc control system and providing the solution of getting the power and control signals to the constantly moving pontoon.

Vanguard Submarine Contract

We have unrivalled experience in designing and building magnetic treatment facilities for Naval vessels and provided all of the UK fixed installations and the interim facility used by the `Vanguard` class of submarines.

For the contract we designed and built a number of power supplies, a "close wrap" solenoid to enclose the entire hull and created a method of fitting the coil to the vessel using divers working with a shore crew.


in control of your power